
FAQ
Clarify the project boundary before requesting a quote
These questions help clients, suppliers, forwarders, installers and local professionals work from the same project brief.
Can the product be used directly as a home in my country?
Use as a temporary or permanent building depends on local planning, building, structural, fire, energy and MEP requirements. A qualified local professional should confirm the approval pathway before order placement.
Which options can be customized?
Layouts, doors, windows, finishes, kitchen, bathroom, furniture, equipment, electrical standards and plumbing interfaces can be reviewed per project. The approved drawings and schedule govern the final scope.
How are lead time and loading quantity confirmed?
They are confirmed against model, quantity, options, production schedule, packing method, destination port and route. The website does not promise an unreviewed fixed lead time or loading quantity.
Who is responsible for foundations and installation?
Foundations, lifting, site installation, connections and local approvals should be allocated in the technical proposal and contract with local professionals.